Field

Transport in Poland

136 strategic investments in this field. In progress: 34, completed: 93. The strip below carries the full split by status and the value-by-stage figure. The list is ordered by momentum, so whatever is closest to opening comes first, and each record carries a link to its source.

136projects in the database
473 bn PLNvalue-by-stage (nominal, est.)
34in progress
93completed
7planned
1paused
1cancelled

121 of 136 records enter the sum: those with a stated cost, excluding parent programmes (so they are not counted alongside their sub-projects), cancelled records and foreign purchases. Amounts are nominal, in prices from various years, with no inflation adjustment; those recorded in a foreign currency are converted at a fixed rate of EUR 4.30 / USD 4.00. An inventory for comparison, not a ledger of state spending.

Projects in this field

Ordered by momentum: build stage and proximity to opening. Each row carries the status, the opening year and the source count.

  1. Tram to Mistrzejowice – KST Stage IV (Krakow, PPP)1.9 bn PLNunder constructionin the home stretch2026under a year late7 src.
  2. Reconstruction of the runway and taxiways at Rzeszów-Jasionka Airport (CEF Military Mobility)0.11 bn PLNunder constructionin the home stretch20267 src.
  3. Completion and expansion of Warsaw metro line II (eastern-northern and western sections)10 bn PLNunder construction2026about 4 years late7 src.
  4. S10 Expressway Bydgoszcz – Toruń2.1 bn PLNunder construction20273 src.
  5. Vistula Spit Canal and Waterway to Elbląg2.0 bn PLNunder construction2027about 4 years late9 src.
  6. Szczecin Metropolitan Railway1.4 bn PLNunder construction202676 mo. late6 src.
  7. Expansion and Modernisation of Poznań-Ławica Airport1.3 bn PLNunder construction20276 src.
  8. T5 Terminal at the Port of Gdańsk – offshore wind installation terminal1.2 bn PLNunder construction20264 src.
  9. Expansion of Wrocław Airport (Operational Area, Stage I)0.38 bn PLNunder construction20265 src.
  10. S7 Warsaw – Gdańsk / Warsaw – Krakow (corridor-closing sections)n/aunder construction20267 src.
  11. S19 Rzeszów Południe – Babica (TBM tunnel)3.0 bn PLNunder construction20286 src.
  12. Expansion of the A2 Motorway Łódź–Warsaw with a Third/Fourth Lane1.5 bn PLNunder construction20285 src.
  13. Improving access to the Port of Gdańsk – modernization of waterway 2 (4 quays)0.53 bn PLNunder construction20287 src.
  14. Gdańsk Airport Investment Programme 2025–20280.50 bn PLNunder construction20289 src.
  15. S17 Expressway Piaski – Hrebenne (border with Ukraine)n/aunder construction20288 src.
  16. A2 Motorway eastward: Warsaw (Lubelska) – Biała Podlaska – Terespol/Koroszczyn4.6 bn PLNunder construction20295 src.
  17. CPK Airport / Port Polska (Baranów–Wiskitki–Teresin)43 bn PLNin preparation2032about 5 years late8 src.
  18. Programme for the Construction of 100 Bypasses for 2020–203028 bn PLNunder construction20307 src.
  19. Podłęże – Piekiełko: 58 km new railway line + modernisation of line 104 Chabówka – Nowy Sącz17 bn PLNunder construction20307 src.
  20. Deepwater Container Terminal in Świnoujście (Przylądek Pomerania)10 bn PLNunder construction203011 src.
  21. Outer Port at the Port of Gdynia (deep-water container terminal, PPP)5.0 bn PLNplanned6 src.
  22. Reconstruction of Warszawa Wschodnia station3.6 bn PLNin preparation20295 src.
  23. Cross-city rail tunnel in Łódź (Łódź Fabryczna – Łódź Kaliska/Żabieniec)2.3 bn PLNpaused203111 src.
  24. Katowice Airport Investment Programme 2024–2032 (new main terminal)1.8 bn PLNin preparation20325 src.
  25. Modernization and expansion of Chopin Airport in Warsaw0.94 bn PLNin preparation20296 src.
  26. Central Communication Port Programme (CPK Multi-Year Programme 2024–2032)132 bn PLNunder construction2032about 5 years late12 src.
  27. High-Speed Rail "Y": Warsaw – CPK – Łódź – Wrocław/Poznań80 bn PLNunder construction20359 src.
  28. S19 Via Carpatia Expressway (Polish section)27 bn PLNunder construction2031about 5 years late8 src.
  29. S61 Via Baltica expressway11 bn PLNcompletedfreshly completed2025about 4 years late10 src.
  30. Autostrada A1 Toruń–Stryków (środkowy odcinek GDDKiA, POIiŚ)(name in Polish, no English version yet)5.7 bn PLNcompleted20146 src.
  31. Autostrada A4 Tarnów (w. Krzyż) – Rzeszów (w. Rzeszów Wschód) wraz z odcinkiem drogi ekspresowej S19 (w. Rzeszów Zachód – w. Świlcza)(name in Polish, no English version yet)5.3 bn PLNcompleted20158 src.
  32. Droga ekspresowa S8 na odcinku węzeł Walichnowy – Łódź (A1) (kierunek Wrocław – Łódź)(name in Polish, no English version yet)5.1 bn PLNcompleted20145 src.
  33. Modernizacja linii kolejowej E30/C-E30 Kraków – Rzeszów (odcinek Podłęże – Rzeszów, etap III)(name in Polish, no English version yet)4.7 bn PLNcompleted2017about 4 years late6 src.
  34. Warsaw Southern Bypass S2 with the tunnel under Ursynów4.6 bn PLNcompleted20218 src.
  35. Expansion of Kraków Airport (New Investment Plan: Terminal Stage I + New Runway)4.2 bn PLNunder construction20326 src.
  36. II linia metra w Warszawie – odcinek centralny (Rondo Daszyńskiego – Dworzec Wileński)(name in Polish, no English version yet)4.2 bn PLNcompleted20155 src.
  37. Autostradowa Obwodnica Wrocławia A8 (z Mostem Rędzińskim przez Odrę)(name in Polish, no English version yet)4.0 bn PLNcompleted20114 src.
  38. Droga ekspresowa S17 Warszawa (Zakręt) – Kurów Zachód (część trasy Warszawa – Lublin)(name in Polish, no English version yet)4.0 bn PLNcompleted20206 src.
  39. Modernization of the E59 line Poznań Główny – Szczecin Dąbie4.0 bn PLNcompleted20258 src.
  40. A1 Motorway Tuszyn–Częstochowa (completion of the A1)3.7 bn PLNcompleted20217 src.
  41. Droga ekspresowa S7 Gdańsk – Elbląg (Koszwały – Kazimierzowo)(name in Polish, no English version yet)3.2 bn PLNcompleted20186 src.
  42. Modernizacja linii kolejowej E 65 (C-E 65), odcinek Warszawa – Gdynia (LK9)(name in Polish, no English version yet)3.2 bn PLNcompleted7 src.
  43. A1 Motorway Gdańsk–Toruń (Gdańsk Transport Company concession section)3.1 bn PLNcompleted20116 src.
  44. Autostrada A1 Częstochowa – Pyrzowice(name in Polish, no English version yet)3.0 bn PLNcompleted20195 src.
  45. S6 completion: Koszalin – Słupsk – Bożepole Wielkie2.9 bn PLNcompletedfreshly completed20268 src.
  46. Tri-City Metropolitan Ring Road (S6)2.9 bn PLNcompletedfreshly completed2025under a year late12 src.
  47. Purchase of Pendolino ED250 trains (PKP Intercity)2.6 bn PLNcompleted20149 src.
  48. Reconstruction of Warszawa Zachodnia Station2.6 bn PLNcompletedfreshly completed2025about 2 years late7 src.
  49. S7 Naprawa – Skomielna Biała section with the tunnel under Luboń Mały (Zakopianka)2.5 bn PLNcompleted2022about 1 year late4 src.
  50. Droga ekspresowa S5 Poznań – Wrocław(name in Polish, no English version yet)2.4 bn PLNcompleted20198 src.
  51. Droga ekspresowa S3 Szczecin – Gorzów Wielkopolski(name in Polish, no English version yet)2.3 bn PLNcompleted20106 src.
  52. Autostrada A1 Sośnica (Gliwice) – Gorzyczki (śląski odcinek A1, przez Świerklany)(name in Polish, no English version yet)2.2 bn PLNcompleted20125 src.
  53. Prace na linii kolejowej E20 na odcinku Warszawa – Poznań – pozostałe roboty, odcinek Sochaczew – Swarzędz (druga modernizacja E20)(name in Polish, no English version yet)2.2 bn PLNcompleted202337 mo. late8 src.
  54. Droga ekspresowa S8 Konotopa – Powązkowska (Trasa Armii Krajowej, Warszawa)(name in Polish, no English version yet)2.1 bn PLNcompleted20115 src.
  55. Droga ekspresowa S3, odcinek Gorzów Wielkopolski – Sulechów(name in Polish, no English version yet)2.1 bn PLNcompleted20145 src.
  56. Baltic Hub T3 – the third deep-water container terminal in Gdańsk2.0 bn PLNcompletedfreshly completed202510 src.
  57. Modernization of the E30 railway line Katowice – Krakow2.0 bn PLNunder construction6 src.
  58. Droga ekspresowa S3 Nowa Sól – Legnica (odcinek Kaźmierzów – Legnica)(name in Polish, no English version yet)2.0 bn PLNcompleted2021about 3 years late6 src.
  59. Modernization of the Świnoujście–Szczecin fairway to 12.5 m2.0 bn PLNcompleted20227 src.
  60. Modernizacja linii kolejowej nr 8, odcinek Warszawa Okęcie – Radom (LOT A–F)(name in Polish, no English version yet)1.9 bn PLNcompleted20235 src.
  61. Zakup do 213 tramwajów dla Tramwajów Warszawskich (kontrakt z Hyundai Rotem, 2019)(name in Polish, no English version yet)1.8 bn PLNcompletedfreshly completed20248 src.
  62. Autostrada A1 Toruń Południe – Kowal (odcinek Czerniewice–Kowal, budowa A1 Toruń–Stryków)(name in Polish, no English version yet)1.8 bn PLNcompleted2014about 2 years late7 src.
  63. Autostrada A4 Jarosław – Korczowa (granica z Ukrainą)(name in Polish, no English version yet)1.8 bn PLNcompleted20136 src.
  64. S3 Bolków – Kamienna Góra with the TS-26 tunnel (S3 Legnica–Lubawka)1.8 bn PLNcompletedfreshly completed20242 mo. late8 src.
  65. New Łódź Fabryczna Station (with multimodal hub)1.8 bn PLNcompleted201622 mo. late12 src.
  66. Modernizacja linii kolejowej E59 na odcinku Wrocław – Poznań (linia nr 271)(name in Polish, no English version yet)1.7 bn PLNcompleted2023about 3 years late4 src.
  67. Most Siekierkowski i Trasa Siekierkowska w Warszawie(name in Polish, no English version yet)1.6 bn PLNcompleted20077 src.
  68. Zakup 20 elektrycznych zespołów trakcyjnych Stadler/Newag FLIRT (ED160) dla PKP Intercity(name in Polish, no English version yet)1.6 bn PLNcompleted20154 src.
  69. Droga ekspresowa S7 – Południowa Obwodnica Gdańska (Straszyn – Koszwały)(name in Polish, no English version yet)1.6 bn PLNcompleted20124 src.
  70. Zintegrowany Projekt modernizacji i rozwoju infrastruktury tramwajowej w Aglomeracji Śląsko-Zagłębiowskiej wraz z zakupem taboru tramwajowego (POIiŚ 2014-2020)(name in Polish, no English version yet)1.6 bn PLNcompleted20235 src.
  71. Autostrada A1 Pyrzowice – Piekary Śląskie(name in Polish, no English version yet)1.5 bn PLNcompleted20126 src.
  72. Zakup 186 tramwajów PESA 120Na Swing dla Tramwajów Warszawskich(name in Polish, no English version yet)1.5 bn PLNcompleted20134 src.
  73. S1 Węgierska Górka bypass (Przybędza – Milówka)1.4 bn PLNcompletedfreshly completed2025about 3 years late7 src.
  74. Budowa drogi ekspresowej S3 Gorzów Wielkopolski – Nowa Sól, odcinek Sulechów (w. Kruszyna) – Nowa Sól (II jezdnia S3 oraz II jezdnie obwodnic Gorzowa Wlkp. i Międzyrzecza)(name in Polish, no English version yet)1.3 bn PLNcompleted20184 src.
  75. Zakup 20 elektrycznych zespołów trakcyjnych Pesa Dart ED161 dla PKP Intercity(name in Polish, no English version yet)1.3 bn PLNcompleted20162 mo. late4 src.
  76. Deepening of the approach fairway and internal basins of the Port of Gdynia to 16 m1.3 bn PLNcompletedfreshly completed2026about 2 years late7 src.
  77. Droga ekspresowa S69 (obecnie S1) Bielsko-Biała – Żywiec – Zwardoń(name in Polish, no English version yet)1.2 bn PLNcompleted20155 src.
  78. Droga ekspresowa S8 Wyszków – granica woj. mazowieckiego/podlaskiego (kierunek Warszawa – Białystok)(name in Polish, no English version yet)1.2 bn PLNcompleted20184 src.
  79. Most Marii Skłodowskiej-Curie (Most Północny) w Warszawie wraz z Trasą Mostu Północnego(name in Polish, no English version yet)1.2 bn PLNcompleted20127 src.
  80. Autostrada A4 Zgorzelec – Krzyżowa(name in Polish, no English version yet)1.1 bn PLNcompleted20094 src.
  81. Modernizacja linii kolejowej E20 na odcinku Siedlce – Terespol(name in Polish, no English version yet)1.1 bn PLNcompleted20155 src.
  82. Autostrada A1 Świerklany – Gorzyczki (granica z Czechami, most w Mszanie)(name in Polish, no English version yet)1.1 bn PLNcompleted201425 mo. late6 src.
  83. Zakup 35 pociągów Siemens Inspiro dla Metra Warszawskiego(name in Polish, no English version yet)1.1 bn PLNcompleted20135 src.
  84. Autostrada A1 Stryków (Łódź Północ) – Tuszyn (wschodnia obwodnica Łodzi)(name in Polish, no English version yet)1.0 bn PLNcompleted20167 src.
  85. Falochron osłonowy dla portu zewnętrznego w Świnoujściu (osłona terminalu LNG)(name in Polish, no English version yet)1.0 bn PLNcompleted20134 src.
  86. Autostrada A4 Rzeszów Wschód – Jarosław Zachód(name in Polish, no English version yet)0.99 bn PLNcompleted20164 src.
  87. Tunnel under the Świna in Świnoujście0.91 bn PLNcompleted2023under a year late5 src.
  88. Pomorska Kolej Metropolitalna (nowa linia Gdańsk Wrzeszcz – Port Lotniczy – Kartuzy/Kościerzyna)(name in Polish, no English version yet)0.91 bn PLNcompleted20155 src.
  89. Reconstruction of national road DK18 to A18 motorway standard (southern carriageway)0.90 bn PLNcompleted20236 src.
  90. Modernizacja linii kolejowej Warszawa – Łódź (linie nr 1 i 17), etap I i II(name in Polish, no English version yet)0.87 bn PLNcompleted20066 src.
  91. Głębokowodny Terminal Kontenerowy DCT Gdańsk (Baltic Hub) – Terminal T2(name in Polish, no English version yet)0.86 bn PLNcompleted20167 src.
  92. Autostrada A4 Kraków – Szarów(name in Polish, no English version yet)0.84 bn PLNcompleted20093 src.
  93. DCT Gdańsk Deepwater Container Terminal (Baltic Hub) – Terminal T10.80 bn PLNcompleted20074 src.
  94. Warsaw-Radom Airport (expansion of the Radom-Sadków airport)0.80 bn PLNcompleted2023about 3 years late12 src.
  95. Modernizacja infrastruktury tramwajowej i trolejbusowej w Aglomeracji Górnośląskiej wraz z infrastrukturą towarzyszącą (POIiŚ 2007–2013)(name in Polish, no English version yet)0.80 bn PLNcompleted20154 src.
  96. Trasa W-Z w Łodzi (linia tramwajowa Retkinia–Widzew z przedłużeniem na Olechów)(name in Polish, no English version yet)0.75 bn PLNcompleted20156 src.
  97. Wrocław – program Tramwaj Plus (Zintegrowany System Transportu Szynowego w Aglomeracji i we Wrocławiu – Etap I)(name in Polish, no English version yet)0.74 bn PLNcompleted20126 src.
  98. Droga ekspresowa S7 Skarżysko-Kamienna – Występa(name in Polish, no English version yet)0.72 bn PLNcompleted20114 src.
  99. Tram to Wilanów (Warsaw)0.69 bn PLNcompletedfreshly completed20244 mo. late10 src.
  100. Droga ekspresowa S8 Jeżewo – Białystok (do węzła Choroszcz)(name in Polish, no English version yet)0.68 bn PLNcompleted20127 src.
  101. Budowa sieci tramwajowej w Olsztynie z taborem Solaris Tramino (reaktywacja tramwajów)(name in Polish, no English version yet)0.65 bn PLNcompleted201517 mo. late6 src.
  102. Krakow Fast Tram stage III: Krowodrza Górka - Górka Narodowa0.60 bn PLNcompleted20234 src.
  103. Modernization of the fairway and expansion of quays in the Inner Port in Gdańsk (stage 1)0.60 bn PLNcompleted20225 src.
  104. Tram Route to Naramowice (Poznań)0.55 bn PLNcompleted20229 src.
  105. ORLEN Maritime Transshipment Terminal on the Martwa Wisła at the Gdańsk Refinery0.50 bn PLNcompletedfreshly completed20268 src.
  106. Expansion of Warsaw-Modlin Airport (Stages I and II)0.50 bn PLNunder construction8 src.
  107. Droga ekspresowa S22 Elbląg – Grzechotki (granica z Rosją)(name in Polish, no English version yet)0.48 bn PLNcompleted20086 src.
  108. Port Lotniczy Lublin (Świdnik) – budowa nowego lotniska regionalnego(name in Polish, no English version yet)0.48 bn PLNcompleted20124 src.
  109. Warsaw-Modlin Airport0.45 bn PLNcompleted20125 src.
  110. Budowa linii tramwajowej do Fordonu w Bydgoszczy(name in Polish, no English version yet)0.44 bn PLNcompleted20167 src.
  111. Rozbudowa terminalu pasażerskiego Portu Lotniczego Kraków-Balice (2013–2016)(name in Polish, no English version yet)0.41 bn PLNcompleted201616 mo. late5 src.
  112. Expansion of Warsaw Chopin Airport (Terminal A)0.40 bn PLNcompleted20156 src.
  113. A4 Motorway Krakow–Katowice (Poland's first toll motorway)0.38 bn PLNcompleted4 src.
  114. Łódzki Tramwaj Regionalny (ŁTR)(name in Polish, no English version yet)0.28 bn PLNcompleted20085 src.
  115. Trasa tramwajowa os. Lecha – Franowo (z tunelem) w Poznaniu(name in Polish, no English version yet)0.26 bn PLNcompleted20126 src.
  116. Krakowski Szybki Tramwaj (KST) – program „krakowskiego premetra” (etap I z tunelem, etapy II)(name in Polish, no English version yet)0.21 bn PLNcompleted20157 src.
  117. Świnoujście Offshore Terminal – ORLEN Neptun Offshore Wind Farm Installation Terminal0.17 bn PLNcompletedfreshly completed20258 src.
  118. A2 Motorway (Świecko–Poznań–Łódź–Warsaw section)n/acompleted201210 src.
  119. S8 Expressway Wrocław (Magnice) – Kłodzkon/aunder construction20334 src.
  120. Warsaw Metro – Line 1 (M1) Kabaty–Młocinyn/acompleted20088 src.
  121. Modernizacja Centralnej Magistrali Kolejowej (LK4) do 200 km/h dla Pendolino (Grodzisk Maz. – Zawiercie)(name in Polish, no English version yet)n/acompleted20175 src.
  122. Modernization of line No. 201 Maksymilianowo – Gdynia (coal trunk line, access to the Port of Gdynia)n/aunder construction2032about 4 years late4 src.
  123. Naftoport – morski terminal przeładunku ropy naftowej i paliw w Porcie Północnym w Gdańsku(name in Polish, no English version yet)n/acompleted19915 src.
  124. Pierwsza modernizacja linii kolejowej E20 na odcinku Warszawa – Poznań – Kunowice (PHARE/ISPA/EBI, 160 km/h)(name in Polish, no English version yet)n/acompleted20094 src.
  125. Poznański Szybki Tramwaj (PST) – trasa północna ("Pestka")(name in Polish, no English version yet)n/acompleted19975 src.
  126. Rail Baltica – Polish E75 Section (Warsaw – Białystok – Ełk – Trakiszki)n/aunder construction7 src.
  127. Terminal 1 of Warsaw-Okęcie Airport (1992)n/acompleted19925 src.
  128. Warsaw Agglomeration Ring Road (A50/S50)18 bn PLNplanned20355 src.
  129. Krakow Metro – Line 1 (M1)13 bn PLNplanned7 src.
  130. Silesian Canal11 bn PLNplanned6 src.
  131. Warsaw railway junction: modernization of the cross-city line + second cross-city line (tunnel under the Vistula)9.0 bn PLNplanned20405 src.
  132. Warsaw Metro Line III – Stage I (Praga-Południe, Stadion Narodowy – Gocław)6.0 bn PLNplanned20326 src.
  133. Protective Breakwaters of the Outer Port in Gdynia0.54 bn PLNin preparation20285 src.
  134. Expansion of the A4 Motorway Krzyżowa–Legnica–Wrocław (+ S5 Sobótka–Bolków)n/aplanned5 src.
  135. Tramwaje Śląskie – modernization and development of tram infrastructure in the Metropolis GZM (Górnośląsko-Zagłębiowska Metropolia) (FEnIKS 2021-2027)1.3 bn PLNin progress8 src.
  136. CPK Rail Spokes (hub-and-spoke model)n/acancelled9 src.