PROJEKTOMETR · Poland’s megaproject database

Is Poland
really developing?

439 strategic investments, 266 of them current, with 173 earlier landmarks added as background. Each is worth at least PLN 500 million or has been deemed strategic. Completed ones, ones under construction and the ones that failed, from governments of every stripe. Zero politics, sources only. Judge for yourself.

439
megaprojects in the database
PLN 1424 billion
value-by-stage (nominal, est.)
102
happening now
What Projektometr is: a database of selected strategic investments (cost ≥ PLN 500 million or strategic status), with a source link behind every fact.  What it is not: a full ledger of state spending, a verdict on governments, or proof that these investments drove the economy.

01Now

Right now 102 major investments are under way.

Roads, rail, factories, ports and power plants are being built now, all at once and across the country.

See all 102 in the filterable list

Baltic Power Offshore Wind Farm20 bnPurchase of 250 M1A2 Abrams SEPv3 tanks19 bnPolimery Police (PDH and polypropylene installation)7.2 bn75 Stadler FLIRT trains for Koleje Mazowieckie4.8 bnCCGT Ostrołęka combined-cycle gas power plant2.9 bnModernisation of Leopard 2A4 tanks to the Leopard 2PL standard2.4 bnCCGT Grudziądz gas-and-steam power plant (Unit I, 563 MW)2.0 bnTram to Mistrzejowice – KST Stage IV (Krakow, PPP)1.9 bnCentral Integrated Clinical Hospital in Poznań0.86 bnReconstruction of the runway and taxiways at Rzeszów-Jasionka Airport (CEF Military Mobility)0.11 bnBaltica 2 Offshore Wind Farm30 bnNational Municipal Wastewater Treatment Programme (KPOŚK)29 bnPurchase of 48 FA-50 and FA-50PL aircraft12 bnCompletion and expansion of Warsaw metro line II (eastern-northern and western sections)10 bnBaltic Power Offshore Wind Farm20 bnPurchase of 250 M1A2 Abrams SEPv3 tanks19 bnPolimery Police (PDH and polypropylene installation)7.2 bn75 Stadler FLIRT trains for Koleje Mazowieckie4.8 bnCCGT Ostrołęka combined-cycle gas power plant2.9 bnModernisation of Leopard 2A4 tanks to the Leopard 2PL standard2.4 bnCCGT Grudziądz gas-and-steam power plant (Unit I, 563 MW)2.0 bnTram to Mistrzejowice – KST Stage IV (Krakow, PPP)1.9 bnCentral Integrated Clinical Hospital in Poznań0.86 bnReconstruction of the runway and taxiways at Rzeszów-Jasionka Airport (CEF Military Mobility)0.11 bnBaltica 2 Offshore Wind Farm30 bnNational Municipal Wastewater Treatment Programme (KPOŚK)29 bnPurchase of 48 FA-50 and FA-50PL aircraft12 bnCompletion and expansion of Warsaw metro line II (eastern-northern and western sections)10 bn
Completion and expansion of Warsaw metro line II (eastern-northern and western sections)10 bnPurchase of 48 FA-50 and FA-50PL aircraft12 bnNational Municipal Wastewater Treatment Programme (KPOŚK)29 bnBaltica 2 Offshore Wind Farm30 bnReconstruction of the runway and taxiways at Rzeszów-Jasionka Airport (CEF Military Mobility)0.11 bnCentral Integrated Clinical Hospital in Poznań0.86 bnTram to Mistrzejowice – KST Stage IV (Krakow, PPP)1.9 bnCCGT Grudziądz gas-and-steam power plant (Unit I, 563 MW)2.0 bnModernisation of Leopard 2A4 tanks to the Leopard 2PL standard2.4 bnCCGT Ostrołęka combined-cycle gas power plant2.9 bn75 Stadler FLIRT trains for Koleje Mazowieckie4.8 bnPolimery Police (PDH and polypropylene installation)7.2 bnPurchase of 250 M1A2 Abrams SEPv3 tanks19 bnBaltic Power Offshore Wind Farm20 bnCompletion and expansion of Warsaw metro line II (eastern-northern and western sections)10 bnPurchase of 48 FA-50 and FA-50PL aircraft12 bnNational Municipal Wastewater Treatment Programme (KPOŚK)29 bnBaltica 2 Offshore Wind Farm30 bnReconstruction of the runway and taxiways at Rzeszów-Jasionka Airport (CEF Military Mobility)0.11 bnCentral Integrated Clinical Hospital in Poznań0.86 bnTram to Mistrzejowice – KST Stage IV (Krakow, PPP)1.9 bnCCGT Grudziądz gas-and-steam power plant (Unit I, 563 MW)2.0 bnModernisation of Leopard 2A4 tanks to the Leopard 2PL standard2.4 bnCCGT Ostrołęka combined-cycle gas power plant2.9 bn75 Stadler FLIRT trains for Koleje Mazowieckie4.8 bnPolimery Police (PDH and polypropylene installation)7.2 bnPurchase of 250 M1A2 Abrams SEPv3 tanks19 bnBaltic Power Offshore Wind Farm20 bn

Records in progress that are at the construction or commissioning stage. Announcements, permits and tenders are left out, however close their stated deadline. The order follows momentum, which combines the build stage with proximity to opening.

02Leap

What we’ve already built.

What already stands and works comes to 76 completed megaprojects of the contemporary era, worth about PLN 135 billion, across a dozen fields at once. Motorways and express roads grew 7.6× in one generation, from nearly 720 km in 2004 to almost 5,466 km in 2025.

Roads 37.3 bn PLN · 13
Gas 19.2 bn PLN · 10
Rail 14.7 bn PLN · 8
Factories 14.3 bn PLN · 10
Data centres 12.0 bn PLN · 2
Water 7.6 bn PLN · 3
Ports 6.5 bn PLN · 6
Defence 5.4 bn PLN · 5
show all sectors (+12)
Waste-to-energy 3.2 bn PLN · 3
Other 2.8 bn PLN · 1
Culture 2.6 bn PLN · 2
Health 1.8 bn PLN · 2
Wind 1.3 bn PLN · 1
Science 1.2 bn PLN · 3
Energy storage 1.0 bn PLN · 2
Industry 1.0 bn PLN · 1
Solar 0.9 bn PLN · 1
Grids 0.9 bn PLN · 1
Space 0.9 bn PLN · 1
Airports 0.8 bn PLN · 1

The bars show the value of completed contemporary-era projects by sector. The catalogue holds 238 records with status “completed”. Earlier landmarks are collected selectively, so this chart leaves them out. The line between the eras is an editorial one, and the delivery date does not decide it. Figures are nominal, in prices from various years and not adjusted for inflation. Amounts recorded in a foreign currency are converted at the fixed rate of EUR 4.30, USD 4.00 and SEK 0.38. Nuclear and offshore wind are left out and arrive here only once delivered. The sum is “value-by-stage”, a different measure from “total cost”. Express roads: nearly 720 km in 2004 (GDDKiA, 2004 figures), almost 5,466 km in 2025 (GDDKiA, 2025 figures).

Where these figures come from

The PLN 135 billion combines figures on different bases. PLN 91.6 bn is in announced budget envelopes (68%, 46 rec.). PLN 24.7 bn is in contract values (18%, 16 rec.). PLN 19.0 bn is in estimates (14%, 10 rec.). These amounts are not settled outlays. Every card states its own basis for the figure.

show the source quotes

„Wchodząc do Unii Europejskiej, 1 maja 2004 r., Polska miała blisko 720 km dróg szybkiego ruchu”

GDDKiA, 2004 · GDDKiA – Wspólnota europejska i polskie drogi

„Obecnie kierowcy mogą korzystać z niemal 5466 km dróg szybkiego ruchu, w tym ponad 1894 km autostrad i 3571 km dróg ekspresowych.”

GDDKiA, 2025 · GDDKiA – Podsumowanie 2025 roku
FoundationThe earlier landmarks are 173 selected records (years shown: 1974–2027). The set is selective, and we don’t sum the values in this section. Not all of them are finished. Some were cancelled or superseded (7), some are still in progress (4), and chapter 01, “Now”, also shows 2 of the latter. The year on a card is the delivery year. Where none is recorded, the card gives the planned date or the year work started. Cancelled and superseded records carry no year and sit in the “no date” group.
Why separately?Only the current era is collected systematically. The earlier landmarks are a selection, hence their own section. Their costs do enter the “value-by-stage” figure, so the headline sum covers both eras.
2000s 2000 SwePol Link – Poland–Sweden HVDC submarine power cable 2002 Toyota Motor Manufacturing Poland – engine and gearbox plant in Wałbrzych 2003 Fiat Auto Poland Tychy: new Panda lines (2003) 2003 Fiat-GM Powertrain / FCA Powertrain engine plant in Bielsko-Biała (1.3 MultiJet) 2004 190 MWe Combined-Cycle Gas Turbine Block at the 'Zielona Góra' CHP Plant 2005 Basell Orlen Polyolefins – Polypropylene and Polyethylene Plants in Płock 2005 CASA C-295M medium transport aircraft (2001 contract) 2006 Modernisation of railway line Warsaw – Łódź (lines no. 1 and 17), stages I and II 2007 New ArcelorMittal Poland Hot Rolling Mill in Kraków (former Sendzimir Steelworks) 2007 DCT Gdańsk Deepwater Container Terminal (Baltic Hub) – Terminal T1 2007 Dell computer factory in Łódź (Olechów) 2007 Electronic Platform for Collecting, Analysing and Sharing Digital Resources on Medical Events (P1, e-Health) 2007 LG cluster in Kobierzyce/Biskupice Podgórne (LG.Philips LCD / LG Display, LG Electronics) 2007 MAN Truck & Bus heavy truck factory in Niepołomice 2007 Sharp LCD module factory in Łysomice near Toruń (Sharp Manufacturing Poland, Pomorska SEZ Ostaszewo) 2007 Siekierkowski Bridge and Siekierkowska Route in Warsaw 2008 Modernisation and construction of air base infrastructure for F-16 aircraft (Poznań-Krzesiny and Łask) 2008 F-16C/D Block 52+ Multirole Fighter Acquisition Programme (Jastrząb / Peace Sky) 2008 Łódź Regional Tramway (ŁTR) 2008 Warsaw Metro – Line 1 (M1) Kabaty–Młociny 2008 464 MW Power Unit at the Pątnów II Power Plant (first supercritical-parameter unit in the National Power System) 2008 S22 Expressway Elbląg – Grzechotki (border with Russia) 2009 A4 Motorway Kraków – Szarów 2009 A4 Motorway Zgorzelec – Krzyżowa 2009 First modernisation of railway line E20 on the Warsaw – Poznań – Kunowice section (PHARE/ISPA/EIB, 160 km/h) 2009 460 MW power generating unit (supercritical CFB) at Łagisza Power Station 2009 Mondi Świecie – New MP7 Paper Machine and Packaging Line
2010s 2010 Cadbury / Cadbury Wedel (Mondelēz) Chocolate and Chewing Gum Factory in Skarbimierz 2010 Copernicus Science Centre in Warsaw 2010 Diesel Hydrodesulphurisation Unit HON VII (PKN Orlen, Płock) 2010 Ergo Arena (indoor arena on the border of Gdańsk and Sopot) 2010 Improvement of Water Quality in Szczecin (Pomorzany and Zdroje Treatment Plants, ISPA/Cohesion Fund) 2010 S3 Expressway Szczecin – Gorzów Wielkopolski 2010 Poznań Stadium (redevelopment for UEFA Euro 2012) 2010 Płaszów II Wastewater Treatment Plant in Kraków (Cohesion Fund / ISPA) 2011 Wrocław Motorway Bypass A8 (including the Rędzin Bridge over the Oder) 2011 A1 Motorway Gdańsk–Toruń (Gdańsk Transport Company concession section) 2011 858 MW power unit at the Bełchatów Power Plant 2011 Program 10+ (expansion of the Grupa LOTOS refinery in Gdańsk) 2011 PX/PTA Complex – Paraxylene Plant (Płock) and Terephthalic Acid Plant (Włocławek), PKN Orlen 2011 S7 Expressway Skarżysko-Kamienna – Występa 2011 S8 Expressway Konotopa – Powązkowska (Trasa Armii Krajowej, Warsaw) 2011 Stadium in Gdańsk (EURO 2012) 2011 Municipal Stadium in Wrocław (Tarczyński Arena / Stadion Wrocław) 2011 viaTOLL electronic toll system (Kapsch, 2011) 2012 A1 motorway Pyrzowice – Piekary Śląskie 2012 A1 motorway Sośnica (Gliwice) – Gorzyczki (the Silesian A1 section, via Świerklany) 2012 A2 Motorway (Świecko–Poznań–Łódź–Warsaw section) 2012 Expansion and Modernisation of the 'Czajka' Wastewater Treatment Plant in Warsaw (with transmission system and sludge incineration plant) 2012 Lublin Airport (Świdnik): construction of a new regional airport 2012 Maria Skłodowska-Curie Bridge (North Bridge) in Warsaw with the North Bridge Route 2012 National Teleinformatics Network for Emergency Number 112 (OST 112) 2012 Green Unit at the Połaniec Power Plant (a power unit fired 100% by biomass, 205 MW) 2012 Warsaw-Modlin Airport 2012 S7 Expressway – Southern Gdańsk Bypass (Straszyn – Koszwały) 2012 S8 Expressway Jeżewo – Białystok (to the Choroszcz interchange) 2012 Os. Lecha – Franowo tram route (with tunnel) in Poznań 2012 Wrocław – Tramwaj Plus Programme (Integrated Rail Transport System in the Agglomeration and in Wrocław – Stage I) 2013 A4 Motorway Jarosław – Korczowa (Ukrainian border) 2013 Coastal Missile Squadron: first squadron with the NSM system (Siemirowice) 2013 KTO Rosomak Wheeled Armoured Personnel Carrier Programme (Patria AMV Licence) 2013 Lubiatów–Międzychód–Grotów (LMG) oil and gas field, PGNiG 2013 Protective breakwater for the external port in Świnoujście (LNG terminal shelter) 2013 Purchase of 186 PESA 120Na Swing trams for Tramwaje Warszawskie 2013 Purchase of 35 Siemens Inspiro trains for the Warsaw Metro 2013 Spike-LR anti-tank guided missiles (licensed production at ZM Mesko) 2014 A1 motorway Toruń–Stryków (GDDKiA's central section, POIiŚ) 2014 A1 motorway Świerklany – Gorzyczki (Czech border, the Mszana bridge) 2014 A1 motorway Toruń Południe – Kowal (Czerniewice–Kowal section, part of the A1 Toruń–Stryków build) 2014 A4 Motorway Tarnów (Krzyż interchange) – Rzeszów (Rzeszów Wschód interchange), including a section of the S19 expressway (Rzeszów Zachód interchange – Świlcza interchange) 2014 European Solidarity Centre in Gdańsk 2014 Mieczysław Karłowicz Philharmonic in Szczecin 2014 ICE Kraków Congress Centre 2014 POLIN Museum of the History of Polish Jews in Warsaw 2014 S3 Expressway, Gorzów Wielkopolski – Sulechów section 2014 S8 Expressway, Walichnowy interchange – Łódź (A1) section (Wrocław – Łódź direction) 2014 NOSPR Headquarters in Katowice 2014 Purchase of Pendolino ED250 trains (PKP Intercity) 2015 Construction of the Olsztyn tram network with a Solaris Tramino fleet (revival of trams) 2015 e-Taxes / e-Declarations (Ministry of Finance IT projects programme, POIG Priority Axis 7, 2007–2015) 2015 Eastern Poland Broadband Network (SSPW) 2015 Expansion of the Wierzchowice Underground Gas Storage Facility to 1.2 bcm 2015 GAZ-SYSTEM 2009–2015 investment programme (trunk pipelines of the North–South Gas Corridor) 2015 International Congress Centre in Katowice 2015 Internet for Masovia (Regional Broadband Network of the Masovian Voivodeship) 2015 Kraków Fast Tram (KST): the 'Kraków Premetro' Programme (Stage I with Tunnel, Stage II) 2015 LitPol Link (the power bridge): 400 kV Poland–Lithuania electricity interconnection, Ełk–Olita/Alytus 2015 W-Z Route in Łódź (Retkinia–Widzew tram line, extended to Olechów) 2015 Modernisation of railway line E20, Siedlce – Terespol section 2015 Witold Lutosławski National Forum of Music in Wrocław 2015 National Synchrotron Radiation Centre SOLARIS in Kraków 2015 New Seat of the Silesian Museum in Katowice (site of the former "Katowice" Hard Coal Mine) 2015 Pomeranian Metropolitan Railway (new line Gdańsk Wrzeszcz – Airport – Kartuzy/Kościerzyna) 2015 Purchase of 20 Stadler/Newag FLIRT (ED160) electric multiple units for PKP Intercity 2015 Regional Broadband Networks (RSS) – Regional Operational Programmes 2007–2013 2015 Expansion of Warsaw Chopin Airport (Terminal A) 2015 S69 Expressway (now S1) Bielsko-Biała – Żywiec – Zwardoń 2015 Modernisation of tram and trolleybus infrastructure in the Upper Silesian Agglomeration, together with accompanying infrastructure (POIiŚ 2007–2013) 2015 President Lech Kaczyński LNG Terminal in Świnoujście 2015 Warsaw Metro Line 2 (M2) – Central Section (Rondo Daszyńskiego – Dworzec Wileński) 2015 Wielkopolska Broadband Network (WSS) 2016 A1 motorway Stryków (Łódź Północ) – Tuszyn (eastern Łódź bypass) 2016 A4 Motorway Rzeszów Wschód – Jarosław Zachód 2016 Construction of the tram line to Fordon in Bydgoszcz 2016 DCT Gdańsk deepwater container terminal (Baltic Hub) – Terminal T2 2016 Expansion of the Passenger Terminal at Kraków-Balice Airport (2013–2016) 2016 Municipal Waste Thermal Treatment Plant (ZTPOK/ITPOK) in Bydgoszcz 2016 Municipal Waste Thermal Treatment Plant (ITPOK) in Poznań 2016 Purchase of 20 Pesa Dart ED161 electric multiple units for PKP Intercity 2016 Waste Thermal Treatment Plant in Kraków (Ekospalarnia) 2017 Central Trunk Line (Line 4) upgrade to 200 km/h for Pendolino (Grodzisk Maz. – Zawiercie) 2017 EcoGenerator Waste Thermal Treatment Plant in Szczecin 2017 Kormoran II-class Mine Countermeasure Vessels (Project 258): Phase I (Prototype ORP Kormoran) 2017 B11 Power Generating Unit (1,075 MW, Hard Coal) at Kozienice Power Plant 2017 Purchase of M-346 Master (Bielik) advanced jet trainers: 2014 contract 2017 Modernisation of railway line E30/C-E30 Kraków – Rzeszów (Podłęże – Rzeszów section, stage III) 2017 Museum of the Second World War in Gdańsk 2017 Reconstruction of the Silesian Stadium in Chorzów (2009–2017) 2017 Świnna Poręba water reservoir (Lake Mucharskie) 2018 Malczyce barrage on the Oder 2018 Modernisation of the Wrocław Water Node (rebuilding of Wrocław's flood protection system) 2018 CCGT Combined-Cycle Gas-and-Steam Unit in Płock (PKN Orlen, approx. 600 MW) 2018 Construction of the S3 Expressway Gorzów Wielkopolski – Nowa Sól, Sulechów (Kruszyna interchange) – Nowa Sól section (second carriageway of the S3 and second carriageways of the Gorzów Wielkopolski and Międzyrzecz bypasses) 2018 S7 Expressway Gdańsk – Elbląg (Koszwały – Kazimierzowo) 2018 S8 Expressway Wyszków – Mazowieckie/Podlaskie voivodeship border (Warsaw – Białystok direction) 2019 120 mm M120 Rak self-propelled mortar: company fire modules (2016 contract) 2019 A1 motorway Częstochowa – Pyrzowice 2019 EFRA Project (Effective Refining) – Delayed Coking Complex, Grupa LOTOS Refinery in Gdańsk 2019 Gawron corvette / ORP Ślązak patrol ship (project 621/621M) 2019 Opole Power Plant – Units 5 and 6 (2×900 MW, hard coal) 2019 pl.ID - the Polish ID Card (electronic identity document) 2019 S5 Expressway Poznań – Wrocław

03What’s coming

More is scheduled for 2026–2032 than opened in 2020–2025.

The lead of 2026–2032 over 2020–2025 holds for those two windows only. Counting every opening on the axis, more are already behind us than ahead. Projects in progress or planned with no stated opening year get no bar, so the future years sit lower than the data would put them. By value, the two tallest bars fall in 2035 and 2036. Two records with declared dates fill most of them, the “Y” high-speed railway and the first nuclear power plant.

% of GDP (share of the economy in the year the cost figure comes from)
Show the figures (table)
Value by opening year – data table
YearDelivered % GDPPlanned % GDP% of GDPProjects
<19950.38%0%0.38%4
19950%0%0%0
19961.07%0%1.07%1
19970%0%0%3
19980.22%0%0.22%1
19990.23%0%0.23%2
20000.17%0%0.17%1
20010%0%0%0
20020.26%0%0.26%1
20030.47%0%0.47%2
20040.06%0%0.06%1
20050.2%0%0.2%1
20060%0%0%0
20070.66%0%0.66%7
20080.33%0%0.33%5
20090.4%0%0.4%5
20100.41%0%0.41%7
20111.72%0%1.72%10
20121.07%0%1.07%14
20131.26%0%1.26%8
20141.51%0%1.51%12
20151.55%0%1.55%22
20160.68%0%0.68%11
20171.06%0%1.06%12
20180.53%0%0.53%6
20191.24%0%1.24%9
20200.58%0%0.58%5
20211.02%0%1.02%7
20220.77%0%0.77%11
20231.17%0%1.17%21
20240.48%0%0.48%11
20250.98%0%0.98%13
20260.12%2.18%2.29%28
20270%2.01%2.01%23
20280%1.31%1.31%24
20290%0.7%0.7%22
20300%2.13%2.13%16
20310%1.69%1.69%5
20320%1.54%1.54%9
20330%0%0%2
20340%0%0%0
20350%3.18%3.18%4
20360%5.26%5.26%1
2037+0%0%0%3
delivered (already open)in progress / plannedincl. overdue (was already due)verified through 2026. Right of this line, the scheduled pipeline, not yet delivered
The denominator is GDP in the year a project's amount comes from, whatever its opening year. Read on

Projects opened in 2020–2025 add up to about 5% of GDP, on average 0.83% a year. The 2026–2032 window holds about 11.67%, on average 1.67% a year, and almost all of it is a declared pipeline, not yet delivered. None of these amounts is annual spending. The chart leaves out records with no stated opening year, and far more of those are under construction or planned than delivered, so the pipeline comes out low here. Future dates are declared dates, and some will slip.

How this chart is computed

The bars run by opening year. Completed projects sit in their delivery year, the rest at their current planned date. Bar height is the share of GDP, meaning cost divided by nominal GDP in the year the cost figure comes from. That lets projects from different eras be compared despite inflation and the 1995 redenomination. The denominator is GDP in the price year where the source gives one. For amounts converted from a foreign currency we take the year of the exchange rate, and otherwise the year of the cost figure’s date. Where that is missing too, the year comes from the record’s timeline, in the order delivery, planned date, start, announcement. 0 projects have a stated price year and 282 use one of the other three rules. The bar counts rest on 350 records and the height on 282, because 68 projects carry no recorded cost.

macro backdrop: data on the economy, separate from project costs

Poland’s real GDP at constant prices grew 237% since 1990, the most in the region. Czechia’s GDP grew 81% over the same period and Germany’s 55%. This figure is a measure of the scale of the economy. It measures neither prosperity nor project costs. A separate measure, GDP per capita in PPS, rose between 2004 and 2024 from 51 to 79% of the EU average. World Bank, Eurostat. GDP and PPS serve only as a backdrop here. The GDP growth figure we compute ourselves from a World Bank series. The PPS index is read from a Eurostat table, and the road kilometres carry a quote from a primary source. Only that third figure meets the bar every project field has to clear.

04Honestly

Not everything worked. And it’s good that you can see it.

Among the 92 current records that were completed or stopped, 17 did not work out, about 18%. Stopped here means cancelled, superseded or paused. A project under construction or planned has no outcome yet either way, so it is not in the denominator. A project counts as failed when it was cancelled, superseded or paused, or carries a shortfall material to the project's scale. The shortfall must be established, named by an audit or under investigation. The full list is longer (24), because it also holds failures among the earlier landmarks (7). The rule does not count delays or overruns, although there are far more of those. Where a source speaks about the schedule, 86 of 99 records ran late. Where it speaks about the budget, 26 of 31 are over it. Those two fractions run over the whole database, including records in progress and landmarks. None of these figures is a rate for Polish investment as a whole. The database is a selection, so it is no random sample. On top of that, a withdrawn announcement gets its outcome sooner than a finished build, and sources report a slip more often than a deadline kept. The “Failed” pill in the catalogue follows the same rule. Each of these figures can be reproduced from /api/projekty.json and /api/statystyki.json. We show failures with the same source rigour as successes. They are rarely black-and-white.

This is why the list reads as one-sided in time. A cancellation, a replacement or an established shortfall takes years by its nature, so any large investment active today may have no verdict yet, regardless of when it started. The Central Transport Hub (CPK) and the second nuclear plant are still under way, and the rule above cannot rule on them yet. That does not mean they are faring better. It only means nothing is settled yet.

And even these are rarely black-and-white: Izera was cancelled, and the company that developed it is preparing a different car with Foxconn under a new brand. The post-Northvolt battery factory in Gdańsk is not on the list, although its investor went bankrupt: a new owner restarted production there. Every case is in the database with full context.

The 5 examples above were picked by hand, each for a different kind of failure, and the selection is no ranking of losses. All 24 records sit on a page of their own: the full “Failed” list.

05Where

Where it’s being built.

The map groups projects by voivodeship. Circle size follows the number of projects in the region, and their value plays no part in it. The point map and filters are in the “All projects” section.

Śląskie: 44 projects · PLN 106 billionOpolskie: 8 projects · PLN 17.6 billionWielkopolskie: 33 projects · PLN 148 billionZachodniopomorskie: 28 projects · PLN 74.9 billionŚwiętokrzyskie: 12 projects · PLN 10.9 billionKujawsko-pomorskie: 24 projects · PLN 60.9 billionPodlaskie: 14 projects · PLN 50.5 billionDolnośląskie: 41 projects · PLN 175 billionPodkarpackie: 26 projects · PLN 66.9 billionMałopolskie: 34 projects · PLN 79.5 billionPomorskie: 65 projects · PLN 435 billionWarmińsko-mazurskie: 17 projects · PLN 65.7 billionŁódzkie: 29 projects · PLN 129 billionMazowieckie: 105 projects · PLN 403 billionLubelskie: 17 projects · PLN 45.7 billionLubuskie: 13 projects · PLN 9.4 billion

Tap a region (or hover) to see its breakdown.

Circle colour is the field with the most projects in the voivodeship:Transporttie (several fields with the same count)Energy

409 projects on the map; circle size = number of projects in the voivodeship (not value). Regional counts add up to more than 409 because 65 projects span several voivodeships. The same applies to the amounts: a multi-region project enters each of them at full value, so the regional figures must not be added up – they come to about 44% more than those records do. 25 sensitive sites are counted at voivodeship level (no precise point). 30 projects have no assigned region – off the map.

Full map and table →

06All projects

Now it’s your turn.

Start from a field

9 indexes, each with a summary and the full project list. Filters and the map are below.

439 projects, PLN 1,424 billion

The buckets divide the database with nothing left over, since 102 + 238 + 67 + 9 + 23 = 439. The last term is the stopped records, meaning cancelled, superseded or paused. The “Failed” pill (24) cuts across the buckets. It holds every stopped record and also the live or completed ones where a source states a material shortfall. Added to the other pills, it would count some records twice.

what is momentum?

Momentum = how close a project is to opening: build stage × proximity to its date. “Now” and “home stretch” rank above early plans. Two buckets sit outside that scale because they describe a state rather than a distance from opening: “partly in service” is a project whose first part already runs while the rest is built, and “failed” cuts across the other buckets instead of being one more.

how it went:

The number on a label counts the records where a source names that outcome. It does not say the rest went differently: more often it means we have no quote about them.

opening:
all
19742049
in the home stretch
Energy · 2026

Baltic Power Offshore Wind Farm

PLN 20 billion
under construction
10 src.
in the home stretch
Defence · 2026

Purchase of 250 M1A2 Abrams SEPv3 tanks

PLN 19 billion
under construction
3 src.
in the home stretch
Industry · 2027

Polimery Police (PDH and polypropylene installation)

PLN 7.2 billion
under construction
10 src.8 yearsdelayed
in the home stretch
Transport · 2027

75 Stadler FLIRT trains for Koleje Mazowieckie

PLN 4.8 billion
under construction
4 src.
in the home stretch
Energy · 2026

CCGT Ostrołęka combined-cycle gas power plant

PLN 2.9 billion
under construction
8 src.under a yeardelayedover budget
pre-2020in the home stretch
Defence · 2027

Modernisation of Leopard 2A4 tanks to the Leopard 2PL standard

PLN 2.4 billion
under construction
5 src.
in the home stretch
Energy · 2026

CCGT Grudziądz gas-and-steam power plant (Unit I, 563 MW)

PLN 2.0 billion
under construction
9 src.
in the home stretch
Transport · 2026

Tram to Mistrzejowice – KST Stage IV (Krakow, PPP)

PLN 1.9 billion
under construction
7 src.under a yeardelayed
in the home stretch
Health · 2027

Central Integrated Clinical Hospital in Poznań

PLN 0.86 billion
under construction
10 src.2 yearsdelayedover budget
in the home stretch
Transport · 2026

Reconstruction of the runway and taxiways at Rzeszów-Jasionka Airport (CEF Military Mobility)

PLN 0.11 billion
under construction
7 src.
under construction
Energy · 2027

Baltica 2 Offshore Wind Farm

PLN 30 billion
under construction
8 src.
pre-2020under construction
Environment · 2027

National Municipal Wastewater Treatment Programme (KPOŚK)

PLN 29 billion
under construction
8 src.12 yearsdelayed
in the home stretch
Defence · 2029

Purchase of 48 FA-50 and FA-50PL aircraft

PLN 12 billion
under construction
4 src.
under construction
Transport · 2026

Completion and expansion of Warsaw metro line II (eastern-northern and western sections)

PLN 10 billion
under construction
7 src.4 yearsdelayed
under construction
Industry · 2026

IONWAY cathode materials plant (Umicore + PowerCo/VW) in Nysa

PLN 7.3 billion
under construction
6 src.
in the home stretch
Defence · 2029

Borsuk IFV: first executive contract (111 vehicles)

PLN 6.6 billion
under construction
4 src.
under construction
Industry · 2026

Mercedes-Benz electric van factory (VAN.EA) in Jawor

PLN 4.3 billion
under construction
6 src.
under construction
Energy · 2027

Nowy Rybnik gas-and-steam power plant (CCGT Rybnik, 882 MW)

PLN 3.0 billion
under construction
8 src.+3 mo.delayed
under construction
Defence · 2027

Observation satellites from Airbus Defence & Space (2 satellites + receiving station)

PLN 2.7 billion
under construction
4 src.
under construction
Defence · 2026

F-35A base infrastructure at Świdwin (21st Tactical Air Base)

PLN 2.5 billion
under construction
4 src.
under construction
Digital · 2026

NRRP C1.1.1 – high-speed internet in white-spot areas

PLN 2.5 billion
under construction
5 src.
under construction
Energy · 2027

PAK CCGT Turek combined-cycle unit (ZE PAK, 562 MW)

PLN 2.3 billion
under construction
5 src.
under construction
Transport · 2027

S1 Mysłowice (Kosztowy) – Bielsko-Biała (Suchy Potok)

PLN 2.3 billion
under construction
5 src.
under construction
Transport · 2027

S10 Expressway Bydgoszcz – Toruń

PLN 2.1 billion
under construction
3 src.
under construction
Energy · 2027

Miejska Górka Wind Farm (TAURON Zielona Energia)

PLN 2.0 billion
under construction
6 src.
under construction
Transport · 2027

Vistula Spit Canal and Waterway to Elbląg

PLN 2.0 billion
under construction
9 src.4 yearsdelayedover budget
under construction
Industry · 2026

HBO Project – Hydrocracking Oil Block at the Gdańsk Refinery

PLN 1.8 billion
under construction
5 src.
under construction
Energy · 2027

Żarnowiec Battery Energy Storage System (BESS, 262 MW / 981 MWh)

PLN 1.6 billion
under construction
7 src.
under construction
Digital · 2026

Cyber-Secure Local Government (and the FERC/KPO continuation)

PLN 1.5 billion
under construction
8 src.+3 mo.delayed
under construction
Health · 2027

New Oncology Hospital in Wrocław (DCOPiH)

PLN 1.5 billion
under construction
6 src.