An offshore wind farm of 900 MW (per URE) on the Słupsk Bank, next to the Baltic Power farm. The developer is ORLEN Neptun VIII of the ORLEN Group. In the URE auction of 17 December 2025 the project won a two-sided contract for difference at PLN 476.88/MWh. First power to the grid is planned for 16 December 2032. The farm holds an environmental decision, a siting decision, preliminary grid connection conditions and a permit to lay cables. None of the sources checked gives an investment cost for this farm, so the record has no amount. A detailed cost estimate is to come from the FEED design work carried out by a consortium of three firms. The record is listed as strategic because the government offshore wind programme calls the sector a strategic direction and lists this farm's site area. The project itself is not named as strategic there.
How it went
No outcome assessment on this card. This is not a fault: we show an assessment only where a source quote stands behind it. Of the four axes, 3 carry no assessment yet, one has an assessment with no confirmed quote. The timeline and sources below show what is known about the project. How to read this section
Timeline
- Original dateDec 2032
Significance
The farm is to add 900 MW to offshore wind, for which Poland's Energy Policy until 2040 sets 5.9 GW in 2030 and 11 GW in 2040. ORLEN targets Polish companies accounting for up to half of the project's value over the farm's life cycle.
Sources 7 · 7 independent
Every fact on this card comes from the sources below. Next to sources with a quote you can see which fields they support.
Independence is counted the same way the gate that admits a record counts it: subdomains and titles from one publisher are a single voice, Wikipedia is zero. That is why the number is lower than the number of links. Three is the minimum.
- Urząd Regulacji Energetyki (URE)19 Dec 2025StatusInvestorFunding
Status · InvestorORLEN Neptun VIII Sp. z o.o. – Baltic East Offshore Wind Farm, with an installed electrical capacity of 900 MW
FundingUpon fulfilment of this obligation, the 25-year support period will commence.
- Notes from Poland19 Dec 2025Original dateFunding
Original dateThe planned dates for first power generation are 1 December 2032 for Bałtyk I, 16 December 2032 for Baltic East, and 17 December 2032 for Baltica 9.
FundingAccording to URE, the prices under the CfDs will be 476.88 zloty (€113) per megawatt hour (MWh) for Baltic East, 489.00 zloty/MWh for Baltica 9, and 492.32 zloty/MWh for Bałtyk I.
- BalticWind.EUDescription
DescriptionThe auction was held on 17 December 2025.
- Ministerstwo Klimatu i Środowiska (gov.pl)Significance
StrategicMorska energetyka wiatrowej to strategiczny kierunek transformacji energetycznej wzmacniający bezpieczeństwo energetyczne oraz stanowiący impuls do rozwoju gospodarczego Polski.
StrategicOrlen Neptun 46.E.1 Orlen Neptun VIII sp. z o.o. Orlen 966 MW bd
SignificanceW Polityce Energetycznej Polski do 2040 r. wskazano, że moc zainstalowana w morskiej energetyce wiatrowej osiągnie w 2030 r. wartość 5,9 GW, natomiast w 2040 r. – do 11 GW.
- Poland at Sea18 Nov 2025StageDescriptionSignificance
StageBaltic East already holds a siting decision (PSZW), a preliminary grid connection conditions decision and a permit to lay and maintain cables in internal sea waters and the territorial sea (PUUK).
Descriptionthe Baltic East project has secured an environmental decision from the Regional Directorate for Environmental Protection in Gdańsk (RDOŚ).
SignificanceFąfara emphasises that Polish companies are targeted to account for up to half of the project’s value throughout its lifecycle
- MarinePoland.com9 Mar 2026Description
DescriptionThe work will result in comprehensive technical documentation and a detailed cost estimate for the project, enabling precise planning of subsequent development stages.
Descriptionwill carry out pre-design and engineering work, prepare technical parameters under the Front End Engineering and Design (FEED) phase, and obtain construction permits for the Baltic East Offshore Wind Farm project.
- enerad.pl17 Apr 2025
LocationObiekt zlokalizowano na Ławicy Słupskiej, w bezpośrednim sąsiedztwie farmy Baltic Power – wspólnej inwestycji ORLEN i kanadyjskiej spółki Northland Power.