An LOA with the US government to upgrade all 48 F-16C/D Block 52+ aircraft to the Viper standard (F-16V, Block 72). The defence minister signed it on 13 August 2025 at WZL-2 in Bydgoszcz, and its value is USD 3.8 billion. Work is to run in 2028–2038 in Bydgoszcz. The first two upgraded aircraft are to be tested in the United States.
How it went
This record carries no outcome assessment on any of the four axes yet. The timeline and sources below show what is known about it; the assessment itself has not been made.
Timeline
- Construction start13 Aug 2025
- Current date2038
Change history
- 13 Aug 2025stage: announced
Significance
The aircraft reached Poland in 2006–2008 and, as the minister said, need upgrading after twenty years given current threats. According to the defence minister, all upgrades will be carried out at Polish defence plants in Bydgoszcz, which gives work to WZL-2 and the PGZ group. The F-16 purchase and base infrastructure have their own records.
Sources 4 · 4 independent
Every fact on this card comes from the sources below. Next to each source – which fields it supports.
Independence is counted the same way the gate that admits a record counts it: subdomains and titles from one publisher are a single voice, Wikipedia is zero. That is why the number is lower than the number of links. Three is the minimum.
- European Security & Defence19 Aug 2025StatusCostInvestor
Status · InvestorThe Polish Ministry of National Defence (MND) has signed a letter of offer and acceptance (LOA) to modernise its entire fleet of 48 F-16C/D Block 52+ aircraft to the advanced F-16 Viper (F-16V) standard.
CostThe LOA, which is valued at USD 3.8 billion (EUR 3.26 billion), was signed on 13 August 2025 at the Military Aviation Works No 2
- RMF2413 Aug 2025StageConstruction start
Stage · Construction startŚroda, 13 sierpnia 2025 (18:09) Facebook X (Twitter) e-mail kopiuj link Szef resortu obrony narodowej Władysław Kosiniak-Kamysz podpisał w Bydgoszczy umowę na modernizację wszystkich polskich samolotów bojowych F-16.
- Notes From Poland14 Aug 2025Current date
Current dateThe work will be carried out between 2028 and 2038 at the military aviation works in the Polish city of Bydgoszcz.
- Overt Defense21 Aug 2025